I’m looking forward to seeing the after-incident report from tonight’s Metro-North computer “glitch”.
Commenting to be notified if anyone posts a postmortem or incident report here.
I am looking forward to the analysis of this event: http://www.theguardian.com/uk-news/2014/jan/23/londons-victoria-line-suspended-after-control-room-is-flooded-with-cement
The Metro-North computer “glitch” described as human error, AP story:
http://online.wsj.com/article/AP3e0d4e92f5dd41a09b091619239c819a.html
MTA head Thomas Prendergast said Friday that computers that run Metro-North’s signal system lost power at 7:45 p.m. Thursday when one of two main power supply units was taken out of service for replacement.
He said technicians performing the work did not realize that a wire was disconnected on the other main power supply unit.